Hospitality galley, laundry & facility electrical maintenance
Three-phase troubleshooting and equipment maintenance for coastal hotels, resorts and commercial facilities in Istria — the same diagnostic approach used on ships, applied ashore.

Commercial kitchen & galley equipment
Heavy-duty catering equipment fails on elements, contactors and controls long before the machine itself is worn out. The failed component is identified and replaced rather than the appliance.
- Combi oven element & contactor service
- Dishwasher and booster heater faults
- Induction hob & power module testing
- Extraction fan and interlock wiring
- Cold room & compressor controls
- Thermostat and probe calibration

Facility power & backup systems
Distribution boards in coastal buildings age badly — salt air, humidity and summer load peaks. Thermal and vibration checks find the loose termination before it becomes an outage in high season.
- Three-phase distribution boards
- Thermal & vibration diagnostics
- Emergency generator panels
- RCD / RCBO discrimination checks
- Laundry machinery circuits
- Pool plant and pump controls

Scheduling by season
Inspection and preventive work is booked into periods when the equipment is cold and out of service.
Pre-season
Full board inspection, thermal survey, generator test run, equipment brought up before occupancy rises.
In-season
Reactive faults only, worked around service periods. Early morning and late-night attendance.
Post-season
Strip-down and repair of equipment flagged during the season, parts ordered without pressure.
Faults reported most often
Send the equipment make, model and what it does when it fails. You get a written assessment of the likely cause and the parts involved.
- Combi oven trips the board on heat-up
- Dishwasher will not reach rinse temperature
- Cold room compressor short-cycling
- Laundry dryer heating intermittently
- Induction hob cutting out under load
- Generator fails to take load on changeover
- Pool pump tripping the RCD in the morning
- Extraction fan interlock stopping the burners
Facility inspection scheduling
Send the site, the equipment involved and your service hours. Planned work is scheduled into a window where the equipment is cold.